PROJECT
Fekola Gold Mine Project
[Abstract]:

Fekola Gold Mine Project was in southwest part of Mali, West Africa.
Owner: B2 Gold
Client: Sinostruct Pty
Project Highlights: Completed the project 3 months prior to original schedule
The scope of work
·120,000 dia inches of carbon steel and 316L stainless steel piping
·Size ranging from DN25 (1”) to DN900 (36”).
·Butt Weld and Threaded connection
·Collaboration between manual and robotic welding
·AS3992 welding qualification complied
·External coating: Galvanization, passivation and painting
·Internal coating: Sandblasted then coated with polypropylene inner liner